
eZ-NDT 938691 Inspection Mode Testing 3-1
Inspection Mode Testing 3
1. Launch eZ-NDT …… 3-1
2. Open the eZ-NDT Project …… 3-1
3. Turn on the Analyzer …… 3-1
4. Test Parts …… 3-2
Reviewing NDT Inspection Results …… 3-3
Preparing Reports …… 3-4
A feasibility test and setup of the test parameters must be completed prior to starting
production testing.
1. Launch eZ-NDT.
To run eZ-NDT, double-click the eZ-NDT icon or use your Windows desktop Start button to navigate to
the program file.
2. Open the eZ-NDT Project.
Select Open Project on the File Menu. Find the project of interest and double-click on it. This will open
the project and set up the test parameters.
3. Turn on Analyzer.
Click the Red toggle switch in the Acquisition panel of the Main window. This will initialize the hardware,
for example a ZonicBook/618E, 640, or 650, as applicable. Wait for the Ready status.
Komentarze do niniejszej Instrukcji